Construction and project management for buildings we design

Building is where a design is either delivered or quietly diluted. We take responsibility for the programme, the quality of work and the money, and we report on all three.

How we think about it
  1. 01

    The problem construction usually has

    Most projects that go wrong do not go wrong because of bad design or bad masonry. They go wrong in the gaps — between the architect and the contractor, between what was specified and what was available, between what was promised and what was recorded. Nobody owns the gap, so the client ends up owning it.

  2. 02

    What single accountability changes

    When the same firm holds the design intent and the build, a change on site is a decision rather than a dispute. Substitutions are assessed against the design rather than against convenience. Sequencing is planned around long-lead items instead of discovered when a trade arrives and cannot start. And the person explaining the delay is the person responsible for it.

  3. 03

    Quality is checked, not asserted

    Quality on a site is the sum of small verifications: line and level before plastering, cover and spacing before a pour, slopes and ponding before waterproofing is covered up, service routes photographed before they disappear behind finishes. Checks done at the right moment cost minutes; the same defects found after handover cost weeks. We work to a checklist at each stage and record it.

  4. 04

    Project management consultancy

    If you already have a contractor, or the work sits inside a managed building with its own rules, we can act as project managers instead — running the programme, coordinating trades, checking quality against the drawings and controlling variations, without executing the work ourselves. The Bebo Technologies office at DLF Cybercity was delivered this way, against a fixed move-in date.

How it runs
  1. 01 Estimate and BOQ

    Quantities taken off the drawings, so the number is traceable to something rather than quoted per square foot.

  2. 02 Programme

    The schedule is built backwards from the date you need the building, and long-lead items are ordered first.

  3. 03 Mobilisation

    Site set-up, contractor and vendor appointments, material approvals.

  4. 04 Execution with staged checks

    Work proceeds against a checklist at each stage, recorded before it is covered up.

  5. 05 Progress reporting

    Regular reporting on programme, spend and quality against plan.

  6. 06 Snagging and handover

    Defects listed, closed and verified before you take the keys.

What you receive

The set of things this service hands over. Each one is a document or a decision you keep, whoever builds.

  • Bill of quantities and estimate from the drawing set
  • Construction programme with the critical path identified
  • Contractor and vendor coordination
  • Stage-wise quality checks, recorded
  • Variation and change control against the approved scope
  • Progress reporting with photographs
  • Snagging, de-snagging and handover
  • Post-handover support during the defect liability period
Work of this kind
  • Architecture

    Nagajhara: Eco Resort

    An eco resort at Nagajhara, Nayagarh, planned so that the landscape — not the built form — is what guests remember. Architecture …

  • Interior design

    Nayak residency

    Interior design and execution for the Nayak family in Bhubaneswar: an existing core house reworked with space-saving joinery, warm lighting and storage …

  • Interior design

    Sanjeev Mohanty Residence

    A compact home at Gothapatna, Bhubaneswar, designed and executed for a nuclear family — planned corner by corner so that a small …